Pre-manufactured value
Pre-manufactured value (PMV) is a measure of the extent of offsite construction used on a project.
A project that is predominantly of traditional construction will have a low PMV, whereas a modular construction project would be likely to have a high PMV.
PMV can be calculated based on aspects of the project such as quantity of material manufactured offsite, percentage by volume of precast components and so on. The Department for Education defines PMV as (materials + offsite labour) / (materials + offsite labour + on site labour). Quantitative approaches such as this require that data is available in a suitable format and in sufficient detail to allow comprehensive calculations to be undertaken.
Alternatively a more qualitative approach can be adopted, describing PMV as high, medium or low.
Ref Methodology for quantifying the benefits of offsite construction, Tercia Jansen van Vuuren, CIRIA C792, 2020.
NB DfMA Overlay to the RIBA Plan of Work, Mainstreaming Design for Manufacture and Assembly in Construction, 2nd Edition, published by the RIBA in 2021, defines pre-manufactured value (PMV) as: ‘A proxy measure of project efficiency calculated as the project’s gross capital cost less the cost of prelims (site overheads) and site labour, divided by the gross capital cost, expressed as a percentage. The business-as-usual benchmark is 40%; anything higher has more of its operations conducted off site.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.